Completed Projects

  • Home
  • Completed Projects
  • DAMAC Hills 2 - Central Park and Malibu Bay Project

Completed Projects

DAMAC Hills 2 - Central Park and Malibu Bay Project

Total Area: 280,000 m2

Water Bodies and Landscaping Works:

  • Wave pool with an area of 2,500 m2 complete with 2 water slides
  • Lazy river with length of 400 meters x 4 meters width complete with 4 Nos turbine station and wave generating machine
  • Surf pool with an area of 550 m2 comprising of 7 Nos of 75KW submersible pumps
  • Splash pad – 200 m2 each (2 nos.) & water play equipment
  • 15,000 m2 lagoon with HDPE liner, designed for water activities such as kayaking, boating & others
  • More than 65,000 m2 of hardscape area
  • 5 Kms of pedestrian pathway
  • More than 90,000 m2 of soft landscape area including natural & artificial grass
  • Around 2,750 nos. of palm & trees
  • Complete irrigation system for the whole park
  • Boating deck, beach entry to pond, café building, and others
  • Outdoor cinema screen in the lagoon
  • Complete audio video system including movable lighting system
  • Complete signages and way finding
  • Landscape furniture – around 700 Nos (benches, litter bins, bicycle rack, dog waste bin, coal waste bin, tables, towel stations, lifeguard station, inflatable ring, safety ring/ life buoy, cabanas, sun loungers)
  • Floating fountains (5 nos.) for TSE lagoons aeration system
Sports and Recreation Facilities:
  • Basketball court – 1 Nr
  • Volleyball court – 1 Nr
  • Tennis court – 1 Nr
  • Football court (2 nos.)
  • Paddle court (2 nos.)
  • Cricket field based on international standard of dimensions & lighting system
  • 7 Kms of jogging track
  • Kids play park with all equipment - 3 Nos
  • Outdoor gym & fitness equipment - 3 Nos
  • Barbecue park – 2 Nr
  • Shade structure, pergolas & sitting areas
Buildings and Structures:
  • Main entry pavilion complete building – 1 Nr
  • Toilet blocks buildings – 3 Nos
  • Juice bar building – 1 Nr
  • Malibu Bay pump rooms & machine rooms buildings with a total area of around 700 m2 (7 pump rooms)
  • Central Park pump room building area - 300 m2
  • Main telecom room - 1 Nr
  • Machine room for outdoor cinema at lagoon - 1 Nr
  • Concrete bridges above the lazy river with WPC finishing – 5 Nr
  • Steel structure bridges above the pond complete with WPC Claddings – 1 Nr
MEP Works:
  • Complete MEP works for all the buildings (power, lightings, ventilation, ACU, ERV, fire alarm and fire protection, others)
  • Complete MEP works for all water bodies (wave pool, lazy river, turbine stations, surf pool, lagoon, others)
  • Landscape lighting for the full park
  • DEWA LV cables / electrical network from the pocket substation up to the final load (including isolator panels, MDB, capacitor bank, feeder pillar, control panels, DBs.
  • Potable water supply network for the full park complete with main water booster pump
  • Complete drainage system network (sewerage system, sub surface drainage) including odor control system and all manholes and lifting stations
  • Complete data and telephone network for the full park including manholes and all telecom devices.
  • CCTV network for the full park

Main Utilities / Infrastructure Works:
  • DEWA pocket substations - 3 Nos with 4x1000 KVA transformer (total connected load of 2.90 megawatts)
  • DEWA main potable water supply including main water meter chamber and main water tank
  • Complete Etisalat/Du telecom & data networks system including MTR room and fiber optic cables
  • Approval from Emirates International Accreditation Centre (EIAC)
CLIENT DAMAC Properties
YEAR 2023