Complete design and execution of the following list of scope of works including acquisition of all required NOC from different local authorities (DEWA, RTA, DM DDA, DCD, Etisalat/Du, SIRA, EIAC and others) for the complete Central Park and Malibu Bay in DAMAC Hills 2 with a total landscape area of 280,000m2:
- More than 65,000m2 of hardscape area
- 5 km of Pedestrian Pathway
- More than 90,000m2 of soft landscape area including natural and artificial grass
- Around 2,750 nos. of palm and trees
- Boating deck, beach entry to pond, café building, and others
- Outdoor cinema screen in the lagoon
- Complete audio-visual system including movable lighting system
- Complete signages and way finding
- Landscape furniture – around 700 Nos (benches, litter bins, bicycle rack, dog waste bin, coal waste bin, tables, towel stations, lifeguard station, inflatable ring, safety ring/ life buoy, cabanas, sun loungers)
- Floating fountains (5 nos.) for TSE lagoons aeration system