  • DAMAC Hills 2 - Akoya Oxygen Malibu Bay – MEP Works for Wave Pool & Lazy River Pump Rooms

Completed Projects

DAMAC Hills 2 - Akoya Oxygen Malibu Bay – MEP Works for Wave Pool & Lazy River Pump Rooms

Total Area: 300 m2

Scope of Work:

  • Complete MEP works for all the buildings (power, lightings, ventilation, ACU, ERV, fire alarm and fire protection, others)
  • Complete MEP works for all water bodies (wave pool, lazy river, turbine stations, surf pool, lagoon, others)
  • Landscape lighting for the full Park
  • DEWA LV cables / electrical network from the pocket substation up to the final load (including isolator panels, MDB, capacitor bank, feeder pillar, control panels, DBs.
  • Potable water supply network for the full park complete with main water booster pump
  • Complete drainage system network (sewerage system, sub surface drainage) including odor control system and all manholes and lifting stations
  • Complete data and telephone network for the full park including manholes and all telecom devices
  • CCTV network for the full park
CLIENT DAMAC Properties
YEAR 2023