Total area: 300m2

Scope of works:

  • Complete MEP Works for all the Buildings (Power, Lightings, Ventilation, ACU, ERV, Fire Alarm and Fire Protection, others)
  • Complete MEP Works for all Water Bodies (Wave Pool, Lazy River, Turbine Stations, Surf Pool, Lagoon, others)
  • Landscape Lighting for the full Park
  • DEWA LV Cables / Electrical Network from the Pocket Substation upto the final Load (including Isolator Panels, MDB, Capacitor Bank, Feeder Pillar, Control Panels, DBs.
  • Potable Water Supply network for the full park complete with Main Water Booster Pump
  • Complete Drainage System Network (sewerage system, sub surface drainage) including Odour control system and all manholes and lifting stations
  • Complete Data and Telephone Network for the full park including manholes and all Telecom devices.
  • CCTV Network for the full park
CLIENT DAMAC Properties