DAMAC Hills 2 - Akoya Oxygen Malibu Bay – MEP Works for Wave Pool & Lazy River Pump Rooms
Total area: 300m2
Scope of works:
- Complete MEP Works for all the Buildings (Power, Lightings, Ventilation, ACU, ERV, Fire Alarm and Fire Protection, others)
- Complete MEP Works for all Water Bodies (Wave Pool, Lazy River, Turbine Stations, Surf Pool, Lagoon, others)
- Landscape Lighting for the full Park
- DEWA LV Cables / Electrical Network from the Pocket Substation upto the final Load (including Isolator Panels, MDB, Capacitor Bank, Feeder Pillar, Control Panels, DBs.
- Potable Water Supply network for the full park complete with Main Water Booster Pump
- Complete Drainage System Network (sewerage system, sub surface drainage) including Odour control system and all manholes and lifting stations
- Complete Data and Telephone Network for the full park including manholes and all Telecom devices.
- CCTV Network for the full park
| CLIENT |
DAMAC Properties |
| YEAR |
2023 |